『Installation of Anuba flowmeter』Related information(clamp on meter|electromagnetic meter|venturi meterrotameter|orifice meter|ultrasonic flow meter|mass flow meter|coriolis mass flow meter|coriolis flow meter|magnetic flow meter|magmeter flow meter|magflow flow meter|mag meter flow meter|electromagnetic flow meter|vortex flow meter|turbine flow meter|thermal mass flow meter|thermal flow meter|rotameter flow meter)

1. Selection of Annubar for Annubar
Guide for Annubar Flow Meter Brief Installation Guide Step 1: Determine the correct installation direction and straight pipe section requirements for Annubar Flow Meter (DECAnnubar) Step 2: Drill holes on the pipeline Note: Drilling holes must be drilled on the pipeline. If acetylene gas or other ablation methods are used for drilling, the maximum flow error after installation can reach 10%!!! Sensor size, drilling size, drilling error Sensor 119 mm+1 mm / -0.00 mmSensor 234 mm+1 mm / -0.00 mmSensor 364 mm+1 mm / -0.00 mm1. Release the pipeline pressure and discharge the accumulated liquid Choose the location where you will drill holes. For vertical pipelines, you can drill holes at any position in the circumferential direction For horizontal pipelines, the location of openings is based on the application of Annubar fluid measurement ·Measurement of liquids: Hole at the bottom of the pipeline · Measurement of gases: Hole at the top of the pipeline · Measurement of steam: Hole at the bottom of the pipeline 3 Based on the above table, determine the size of the opening four After opening the hole, remove the burrs inside the hole If it is also necessary to install a counter support, drill a second hole in the direction opposite to the first opening, and then remove the burrs inside the hole Step 3: Weld the welding connector onto the pipeline Assemble the welding connectors provided by the factory and insert them into the drilled holes Align the wires on the installation head of the Anuba (or transmitter - if it is an integrated instrument) so that they are parallel to the pipeline Spot welding, fix the welding connection to the pipeline, and then remove the Annubar sensor. 4


Current position > Product detail