『Demineralized water flow meter』Related information(clamp on meter|electromagnetic meter|venturi meterrotameter|orifice meter|ultrasonic flow meter|mass flow meter|coriolis mass flow meter|coriolis flow meter|magnetic flow meter|magmeter flow meter|magflow flow meter|mag meter flow meter|electromagnetic flow meter|vortex flow meter|turbine flow meter|thermal mass flow meter|thermal flow meter|rotameter flow meter)

1. What precautions should be taken for the water pressure test of boilers in thermal power plants? The water pressure test of boilers in thermal power plants should strictly follow current industry standards such as DL/T 5075-2015 "Technical Guidelines for Water Pressure Test of Boilers in Thermal Power Plants" and DL/T 5047-2019 "Code for Acceptance and Evaluation of Construction Quality of Electric Power Construction Part 2: Boiler Units". The entire process should control the test conditions, parameters, and safety boundaries to avoid overpressure instability, medium leakage, and personal injury risks.
1. Preparation before the experiment (1) Confirmation of basic conditions 1 The installation of the boiler body and its ancillary steam and water system has been completed, and all welding joints have passed non-destructive testing. The expansion gap and support status of the heating surface and the header meet the design requirements. All temporary reinforcement facilities have been removed. 2. The testing equipment has been verified as qualified: the booster pump, pipeline, etc. have no leaks, the pressure gauge accuracy is not less than 1.6 levels, the range is 1.5~2 times the test pressure, and at least 2 pieces are arranged symmetrically at the high and low points of the system. They are regularly reported to Hongxiang for inspection and calibration. 3. The test water quality meets the standard: desalinated water or condensed water is used, and the water temperature is controlled at 20~70 ℃ to avoid thermal stress caused by excessive temperature difference between the water temperature and the metal wall. 4. The system is isolated in place: all external connections are closed. Valves, isolation safety v

II. Key points for controlling the experimental process 1 Strict control of pressure rise rate: During the formal pressure rise stage, the rate should not exceed 0.3MPa/min. After reaching the design working pressure, the pressure rise should be paused. After a comprehensive inspection of the header, welds, flanges, and other parts for abnormalities, the pressure should be slowly increased to the test pressure. 2. Compliance of test parameters: The test pressure for subcritical boilers is 1.25 times the design pressure, and the holding time should not be

Current position > News detail